Rs 5670 only/-
Proposed Work
Here whole work is divide into four phase pre-process, generate initial population, teacher, student phase. In each phase working is same for any number of jobs or machine. It means that if the number of jobs is change or number of machine requirement for job is differ then step remain same.
Pre-Processing:
As the dataset available for processing is present in different file format so, some pre-processing steps are required for the conversion of data into experimental environment. In this work data is inform of vectors of the job timing for different machine. So reading of vectors in string form and conversion of those string in proper numeric value is done in pre-processing. Collection of all vector is done in a single matrix is also done here.
IEEE Base paper | |||
Doc | Complete Project word file document | ||
Source Code | Complete Code files |